ARCHLOGBOOK
GabrielChek.com
  • Start Here
  • 01 - Industry Basics
    • What do Architects really do?
    • Fresh Grad to Architect
    • Understanding how the Industry works
    • Parties Involved
    • Design Process in Practice
    • Working with Consultants
    • Working with Clients
    • Working with Contractors
    • Working with Project Briefs
    • Design & Coordination Basics
    • Specialist Design Items
    • What is Good Building Design?
    • Drawings & Specifications
    • Drafting / BIM conventions
    • Gridlines & Dimensions
    • Plans
    • Sections
    • Elevations
    • Annotation Basics: Plans, Sections & Elevations
    • Hatches
    • Types of Architectural Practices
    • Software & Tools for Architects
    • Building Construction Technologies
    • Parametric Design in Architecture
    • Parametric Design in Construction
    • Future of Archi Practice / AI in the BE Industry
    • Social Architecture
    • Conservation / Adaptive Reuse
    • Additions & Alterations
    • Building Compliance Basics
    • Communication & Negotiation
    • Salary & Career Progression Tips
    • Getting Licensed
  • 02 - Site Planning & Building Design Concepts
    • Feasibility Studies
    • Site Planning & Analysis
    • Concept Design
    • Design Methods
    • Parti Diagrams
    • Anthropometry
    • Program & Circulation
    • Planning Parameters
    • Massing & Orientation
    • Building Height & Coverage
    • Clear Width & Heights
    • Floor Levels
    • Slope Gradients
    • Floorplate Efficiency
    • Natural vs Mechanical Ventilation
    • Driveway Design
    • Lighting (Daylighting vs Artificial)
    • Designing for Fire Safety
    • Sustainable Design
  • 03 - Building Components, Materials & Specifications
    • Overview of Building Materials, Components & Systems
    • Overview of Finishes in Building Materials
    • Tile Types and Design Considerations
    • Types of Walls and Wall Systems
  • 04 - Building Project & Contract Administration
    • Overview of Contract Administration
    • Tender Process for a Measurement Contract
    • Project Management for Young Architects: From Design to Completion
  • Singapore Building Codes & Guides
  • Contract Types (Singapore)
  • Calculators
  • Resources
  • Architecture Siol! Podcast
  • GabrielChek.com
  • Contact
  • Content Feedback & Contributions
  • Sponsorship / Donations
Powered by GitBook
On this page
  • 1) IDD (Integrated Digital Delivery)
  • 2) Building Information Modelling (BIM)
  • 3) Precast Systems
  • 4) Prefabricated Bathroom Unit (PBU)
  • 5) Prefabricated Prefinished Volumetric Consruction (PPVC)
  • 6) Mass Engineered Timber (MET)

Was this helpful?

  1. 01 - Industry Basics

Building Construction Technologies

Learn more about the various building construction technologies here.

PreviousSoftware & Tools for ArchitectsNextParametric Design in Architecture

Last updated 4 months ago

Was this helpful?

We live in an interesting era of building design and construction technologies.

Below are the various technologies available for Architects to employ in their building projects to accelerate and improve project delivery and construction.

1) IDD (Integrated Digital Delivery)

Integrated Digital Delivery (IDD) is the use of digital technologies to integrate work processes and connect stakeholders working on the same project throughout the construction and building life-cycle. This includes design, fabrication and assembly on-site, as well as the operations and maintenance of buildings.

Read more about IDD:

2) Building Information Modelling (BIM)

BIM is a digital representation of a building or infrastructure project that encompasses both graphical and non-graphical information. BIM software allows architects to create intelligent 3D models that contain detailed information about the building's components, materials, systems, and performance attributes.

BIM facilitates collaboration among different project stakeholders and improves the accuracy and efficiency of the design and construction process.

When creating construction drawings and specifications using BIM, architects can extract relevant information from the model to generate detailed drawings, schedules, quantities, and specifications.

3) Precast Systems

Precast systems refer to a construction method where building components, such as walls, columns, beams, and slabs, are manufactured off-site in a controlled factory environment.

These precast elements are then transported to the construction site and assembled to form a complete structure.

Precast systems offer numerous advantages, including improved construction speed, enhanced quality control, reduced labor requirements, and increased durability.

The use of precast systems allows for efficient and precise manufacturing of building components, resulting in faster project completion, minimized on-site disruptions, and the potential for cost savings.

4) Prefabricated Bathroom Unit (PBU)

Prefabricated bathrooms units or PBU are complete bathroom units that are manufactured off-site and then transported to the construction site for installation.

These pre-assembled modules typically include fixtures, fittings, plumbing, electrical systems, and finishes.

Prefabricated bathrooms offer several benefits in the construction industry, including reduced construction time, improved quality control, enhanced cost efficiency, and minimized on-site labor requirements.

By being manufactured in a controlled factory environment, prefabricated bathrooms can achieve higher precision and consistency in terms of design and construction quality.

The off-site construction also allows for concurrent work, where site preparation and foundation work can progress simultaneously with the production of bathroom pods, leading to time savings.

Once delivered to the site, prefabricated bathrooms are quickly installed, reducing on-site construction time, and improving project efficiency.

Learn more about PBU:

5) Prefabricated Prefinished Volumetric Consruction (PPVC)

Prefabricated Prefinished Volumetric Construction (PPVC) is a construction method whereby free-standing 3-dimensional modules are completed with internal finishes, fixtures and fittings in an off-site fabrication facility, before it is delivered and installed on-site.

Learn more about PPVC:

6) Mass Engineered Timber (MET)

Mass Engineered Timber (MET) is a building material comprising engineered wood products with improved structural integrity. This includes:

  • Cross Laminated Timber (CLT)– Layers of wood are stacked cross-wise and bonded with structural adhesives. It is predominantly used for walls, floors and roofs.

  • Glued Laminated Timber (Glulam)– Produced in a similar fashion but with the grain aligned in the same direction. It is predominantly used for columns, beams and truss elements.

Why use MET

  • Improved productivity– As MET is prefabricated offsite, it can achieve up to 35% in time savings at the project level.

  • Better construction environment– Less dust and noise as most work is completed offsite.

  • Improved quality control– Highly precise and automated manufacturing processes results in high quality finishing.

  • Environmental sustainability– MET is harvested from sustainably managed forests, and MET buildings have lower carbon footprint and net carbon emissions compared to steel or concrete buildings

Learn more about Gaia by Toyo Ito, the largest MET building in Asia, sited in Singapore:

Learn more about MET:


Source: Building and Construction Authority Singapore, Stacked Homes, Dezeen

Integrated Digital Delivery (IDD)
https://www.lodplanner.com/what-is-bim/
Prefabricated Bathroom Unit
Prefabricated Prefinished Volumetric Construction (PPVC)
PPVC Construction : Why It Matters For Investors (The Good, Bad, And Ugly)
The Dezeen guide to mass timber in architecture
Mass Engineered Timber
LogoToyo Ito completes "largest wooden building in Asia"Dezeen
Integrated Digital Delivery
Image cedit - lodplanner.com
Image credit: Stacked Homes
Image credit: Dezeen
Image credit : Dezeen