Project Management for Young Architects: From Design to Completion
Here's a clear and concise article on project management for young architects, covering responsibilities from design through to construction and project completion — with an emphasis on key milestones
Being a great architect isn't just about producing beautiful drawings. One of the most important (and often overlooked) parts of your career is project management — keeping a project on track from concept to completion.
As a young architect, you play a vital role in guiding the project team, coordinating between consultants and contractors, and ensuring your design vision is realised on time, on budget, and to specification. This guide will walk you through what to expect at each project stage, and how to contribute meaningfully.
1. Design Stage: From Vision to Approvals
Your Key Roles:
Develop coordinated design drawings in tandem with engineers and consultants
Prepare for and attend various project meetings and presentations
Submit design for authority clearances (e.g., Design Gateway, Construction Gateway, Completion Gateway)
Types of Meetings to Attend:
Client-Consultant Meetings (CCMs): Align on design direction, functional requirements, budget.
Design Reviews: Present architectural proposals to internal team, client, and stakeholders.
Technical Coordination Meetings (TCMs): Resolve clashes between architectural, structural, and M&E elements with consultants and/or contractors.
Milestones to Track:
Design Freeze/Sign-Off by client
Authority Submissions
In-Principle Approvals (IPA)
Tender Documentation Finalisation – coordinated drawings, specifications, and BOQ
Tip: Design sign-offs must be documented. Avoid major changes after tender call to minimise costly variations later.
2. Tender Stage: Pricing and Contract Award
Your Key Roles:
Coordinate tender documentation with QS and consultants
Answer tender queries from contractors
Evaluate technical submissions (with QS on pricing)
Important Documents:
Architectural Drawings – properly coordinated with consultants
Specifications – clear descriptions of materials, finishes, and standards
Addenda – issued to all tenderers if clarifications are made during tender period
Milestone:
Tender Award & LOA Issuance – Project enters the construction phase
3. Construction Stage: Managing Progress On Site
Now the real action begins. As a young architect, you'll likely take on a Contract Administrator or Project Architect role.
Key Responsibilities:
Attend monthly site meetings with contractor and consultants
Monitor construction progress and milestone tracking
Respond to Requests for Information (RFI) and Requests for Approval (RFA)
Review shop drawings and material submissions
Track Variation Orders (VOs) and assess impact
Review Extension of Time (EOT) claims (often raised monthly)
Key Project Management Concepts:
S-Curve (Progress Tracking)
Graphical representation of cumulative progress vs time
Tracks early start, planned progress, and late finish
Used in monthly meetings to evaluate delays or acceleration
RC Cycle (Reinforced Concrete Cycle)
Describes time taken for each structural floor slab to be cast
Important for high-rise projects to assess construction efficiency
RC cycle affects scheduling for architectural and M&E trades
Tracking Logs to Maintain:
RFI/RFA Logs – Ensure timely responses to avoid site delays
VO Logs – Keep tabs on design changes and cost implications
Shop Drawing Logs – Prevent rework due to outdated drawings
EOT Logs – Document reasons, assessments, and approvals of delay claims
4. Construction Milestones to Watch
Coordinated Services Drawings (CSDs)
Must be approved and resolved before major construction phases:
Underground Services – Drain lines, manholes, incoming water/electrical mains
1st Storey High Level Services – Soffit M&E services to coordinate with beam layout
Typical Floor Services – Ensure no clash between ducts, conduits, and slabs
Roof Services – Water tanks, lightning protection, mechanical exhausts
Physical Construction Milestones:
Topping Out / Structural Completion – End of major concrete works
Service Turn-On – Incoming power and water supply activated
Dry Runs for TOP – Internal checks before inviting BCA, SCDF, PUB for inspections
External Works – Carparks, drain channels, landscape must be completed before TOP
Application for Temporary Occupation Permit (TOP) – Key handover milestone
Why These Matter: Missing or delaying these milestones means:
Delay in TOP and key handover
Penalties under contract (e.g. Liquidated Damages)
Frustrated clients and end-users
5. Completion and Close-Out
Final Roles:
Conduct defect inspections with client and contractor
Issue Architect’s Completion Certificate
Track and coordinate Defects Rectification
Assist QS with Final Account sign-off
Final Advice for Young Architects
Take Ownership: You may not be the most senior in the room, but your diligence sets the tone for the team.
Know Your Drawings and Site Conditions: Don’t just rely on the contractor. Visit the site often.
Document Everything: Meeting minutes, RFIs, approvals — your best defence against disputes.
Understand the Milestones: These aren't just administrative dates. They're contractual obligations.
Conclusion
Project management is a crucial skillset for any architect — not just for ensuring the design is built correctly, but also for navigating the legal, contractual, and logistical realities of construction.
Learning to manage meetings, track milestones, and coordinate effectively with your team puts you on the path from being a good architect to becoming a reliable project leader.